News By Tag Industry News News By Location Country(s) Industry News
| ![]() GOAL SYSTEMS does the planning and scheduling for Gautrain, the South Africa World Cup rapid train.One of the project’s key success factors was being in time for the inauguration of the service just before the beginning of the World Cup in South Africa.
By: GOAL SYSTEMS Thousands of spectators and business customers will be able to use the first line section connecting the Johannesburg O.R. Tambo International Airport to the business centre of the city in less than 15 minutes (compared to an average one-hour car ride). Trains will be running every 12 minutes during rush hours and every 20 minutes during off-peak hours. In 2011, Gautrain (contraction of the word Gauteng, the name of the province where the train runs, and the word train) will include 80 kilometers of track. It will connect Pretoria, the country’s administrative capital and Johannesburg, its most populated city, thus reducing traffic congestion on the country’s most travelled road and contributing to the region’s economic development. This vital infrastructure for the country required nearly 5 years of works, and the establishment of the largest works site on the African continent, for a budget totaling €2,5 billion. Eventually, 160,000 passengers will be travelling daily on the ultramodern rail link. Bombela planning process is powered by GOAL SYSTEMS off-the-shelf products GoalRail®metro and GoalStaff®. From timetable generation to daily drivers’ duties, GOAL SYSTEMS fully solves every stage of the planning process for both rolling stock and staff. Ratp Dev is a subsidiary of the RATP, the mass transit operator of the Paris/Ile-de- Bombela is an international group that includes Bombardier Transportation, Bouygues Travaux Publics (a subsidiary of Bouygues Construction) Visit GOAL SYSTEMS:http://www.goalsystems.com/ Visit GOAL SYSTEMS: http://www.goalsystems.com/ # # # Company specializing in the development and roll-out of advanced IT systems applying optimization techniques to achieve better profitability, sustainability and competitiveness through the optimum scheduling and structuring of their resources. End
|
|