What is typical implementation cycle for an ERP solution?

The ERP implementation cycle varies based on various factor, client availability, availability of data as required, modules and scope of work.
 
BUR DUBAI, UAE - Nov. 26, 2017 - PRLog -- What is typical implementation cycle for an ERP solution?

The ERP implementation cycle varies based on various factor, client availability, availability of data as required, modules and scope of work.

This article aims to give you fair idea about the overall flow of the implementation, different vendor uses different terminology while addressing same document and might club two phases in one.

Requirement Study

Functional Requirement Study (FRS)
or Business Requirement Study (BRS) there are various names for this process. Briefly, the requirements are listed down based on the meeting with ERP implementation stakeholders. Usually there is a Module Head and Key users identified to make the information flow smooth.

Outcome

A detailed document with the entire business requirement/ business flow is recorded.

Requirement Analysis

Functional Requirement Documentation (FRD)
for some it is separate document, and many do changes in FRS document in this phase. The requirement listed in the first phase in analyzed to find the GAP. It is also referred as GAP analysis phase. The user requirements are mapped against the ERP solutions and any exception are highlighted.

The documentation should clearly specify the listed user requirement will be met in existing solution or customization is requirement, also can provide work around in-case customization is not required. It could be possible some user requirement need not be possible even after customization due to application architecture – such things need to be highlighted.

Outcome

GAP analysis document with signed acceptance of requirement.

Development

In case any customization required, the development efforts are estimated, and cost is approved by customer prior development.

Outcome

Functional Design Document (FDD) or proto type of functionality flow is prepared for user understanding and approval

Deployment

It has three steps involved

Installation of the application
Data Migration
Training

The software is hosted as per agreement in customer server/ cloud – installation of the application in mentioned computer. Once the application is installed, it must have user historic data, opening balance migrated (in some case transaction also migrated, based on scope). Training – The customer users must be trained on how to use the application.

Customer Acceptance

UAT (User Acceptance Testing) – The user needs to certify that the application is in working condition and as per his requirement (agreed scope)

Go Live

After UAT, the customer will set a date to go live with using the system and discontinue using other system, if applicable

Post Go-Live

After go-live the user might need support and hand holding for some time this is provided by vendor based on agreed scope and cost.

Most vendors charge a fraction of ERP Cost as AMC (Annual Maintenance Contract) this will include cost to fix bug or assist user. For Pricing Inquiry and estimation parameters contact our marketing department of BrainSphere IT Solutions.

Contact
BrainSphere IT Solutions
***@gmail.com
+971526403909
End
Source: » Follow
Email:***@gmail.com
Tags:ERP Dubai, ERP Software Dubai, ERP UAE
Industry:Technology
Location:Bur Dubai - Dubai - United Arab Emirates
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
BrainSphere IT Solutions PRs
Trending News
Most Viewed
Top Daily News



Like PRLog?
9K2K1K
Click to Share