Operated by Metrolink RATP DEV Ltd with GOAL SYSTEMS technology

Since late May, Metrolink is working with shifts generated by GOAL SYSTEMS. This is a large project, which will result, in a short term, the use of GoalRail®metro for schedules generation and GoalStaff® for assignment of personnel.
 
MANCHESTER, U.K. - July 9, 2013 - PRLog -- Since late May, Metrolink, operated by the RATP -Dev is working with shifts generated by GOAL SYSTEMS. This is a large project, which will result, in a short term, the use of GoalRail®metro for schedules generation and GoalStaff® for assignment of personnel.

Manchester's tram has 7 lines, with a total length of 73 kilometers, offering a complete transportation service to the city.This project consolidates a sum of achievements carried out by our company such as Metro d'Alger, Casatram and Gautrain, among others.

Since the beginning of the project, simulations are conducted in which we have reached an important optimization on working hours to cover the same commercial offer. The challenge of this project was marked by the balancing between the need for more efficiency and less costly operation while maintaining the right working conditions of drivers, without affecting the working conditions established.

Visit GOAL SYSTEMS: http://www.goalsystems.com/
Visit GOAL SYSTEMS: http://www.goalsystems.com/index.php?option=com_content&view=article&id=413%3Aoperado-por-metrolink-ratp-dev-ltd-con-tecnologia-de-goal-systems&catid=44%3Aacerca-de-goal&Itemid=256&lang=en
End
Source: » Follow
Email:***@goalsystems.com
Posted By:***@goalsystems.com Email Verified
Tags:Planning, Scheduling, Transport
Industry:Technology, Transportation
Location:Manchester - Cheshire - England
Subject:Projects
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
GOAL SYSTEMS News
Trending
Most Viewed
Daily News



Like PRLog?
9K2K1K
Click to Share