Tandem shale shaker for work over system

Tandem shale shaker is popular with quantities clients. Thanks to its huge treating capacity, and compact constructure for convenient transportation and easy operation. Work over system doesn't need as much treating capacity as well drilling system
 
Oct. 2, 2010 - PRLog -- Tandem shale shaker and dual shaker

Tandem shale shaker is combined two complete single shakers on the same skid. However, it is different with Dual deck shale shaker. As we know, dual deck shaker has two decks on one shale shaker

Tandem shale shaker treating capacity is double of single shale shaker. But according to clients’ requirements, the configuration on work over system will be various.
http://www.gn-desander-desilter.com/tandem-shale-shaker-with-pyramid-screen/


Different XJ work over rigs

Usually we call work over rig as XJ xx. The work over rigs are rather similar with drilling rig. Commonly work over rigs will be divided in to 350HP, 450HP, 550HP rigs. Or we can call them XJ20, XJ30, XJ40, XJ50, etc. That means the work over rigs are matched with well drilling rigs. And the mud system for them are almost same. Just one thing, the work over mud system requires less drilling mud capacity than well drilling mud system


Shale sahkers performance on various system

GNZS83-2 shale shaker is linear motion shale shaker holds about 80M3/h treating capacity, that means about 352GPM. It holds 2 shaker screens. The screen area come to 1.8M2 or 9.5ft2. GNZS83-2 can be used in work over drilling rigs mud system, shallow oil well drilling, such as ZJ20 rigs, as well as 100t HDD mud system.
http://www.gn-shale-shaker.com/gn-mini-hdd-mud-recycling-...

GNZS63-3 Shale shaker is another linear motion shaker designed by GN. It holds about 120M3/h treating capacity. It holds 2 shaker screens. The screen area comes to 2.4M2.

The shaker screen is 630x1250mm. It is same with NOV Brandt shaker screen so it can be replaced by NOV Brandt shaker screen. Also it is the quick replacement type for saving much time. GNZS63-3 Shale shaker usually used in ZJ30 mud system, also 200t, 300t, 450t HDD mud systems.

GNZS83-3 Shale shaker is rather popular shale shaker either as separated equipment or a part of mud system. 83-3 holds about 140M3/h treating capacity.


Tandem shale shaker in work over system

GN can provide all models tandem shale shaker, such as 2xGNZS83-2, 2xGNZS83-3, 2xGNZS63-2, 2xGNZS63-3, etc.

For example, in XJ30 work over system there can be 2 GNZS83-2 shale shaker, or a set of tandem shale shaker as 2xGNZS83-2 or we can design it as 2xGNZS63-2 only if requested by different clients
http://www.dragonproductsltd.com/rigs/xj-450.html

2xGNZS83-2 tandem shale shaker was accepted by Kuwait client for XJ30 system. We manufactured 2 work over system for them including 2 sets of tandem shale shaker, poor boy degasser, desander, etc. drilling mud equipments. They will match equipments on their own mud tanks

# # #

GN provides you qualified goods at your budget. including shale shaker, mud cleaner, decanter centrifuge, centrifugal pump, decanter centrifuge, mud agitator, mud jet mixer, mud gas separator, flare ignition device, whole mud purification sytem
End
Source: » Follow
Email:***@live.cn Email Verified
Zip:063000
Tags:Work Over Mud System, Drilling Rig, Shale Shaker Manufacturer, Tandem Shale Shaker, Oil Well Drilling
Location:Tangshan - Hebei - China
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
GN Shale Shaker PRs
Trending News
Most Viewed
Top Daily News



Like PRLog?
9K2K1K
Click to Share