Earthline Has Options Open With Terex Finlay Fleet

Earthline is building-up flexible configurations to meet a variety of processing requirements, with machinery supplied by Finlay Plant SW at its Shipton Quarry site.
 
June 28, 2013 - PRLog -- Earthline is building-up flexible configurations to meet a variety of processing requirements, with machinery supplied by Finlay Plant SW at its Shipton Quarry site.

Latest additions to the Terex Finlay (http://www.finlaygroup.com/products-terex.php) fleet include a J1175 Jaw Crusher, as well as 863 and 883 heavy duty screens.

They join existing Terex Finlay machines including two 683 inclined screens (http://www.finlaygroup.com/screening.php), another J1175 Jaw Crusher (http://www.finlaygroup.com/crushing.php) and a C1540 Cone Crusher, which all work in unison to process limestone quarried at the Oxfordshire-based site.

Processed material includes 75-40mm gabion, used for roads and railway projects.

The new 863 also provides valuable Type 1 material, and further single-sized products of 40mm, 40-20mm, 20-10mm, 10-5mm and 5mm down are also processed by the machines.

Working at up to 200 tonnes per hour, the configurations of the machinery enable the Earthline team to remain flexible to meet market demand.

Steve Wiltshire, site manager at Shipton Quarry, said: “The machinery works well and gives us lots of options in terms of what we process.

“With different meshes, we can make totally different products.

“We are particularly impressed with the new 863. We had it on trial and decided to keep it.

“We also have excellent support on site from Finlay Plant SW, which is really important for us.”

Earthline has its headquarters near Marlborough, Wiltshire, and specializes in contract earthmoving, landfill facilities and aggregate supplies.

Gareth Johnson, MD of Finlay Plant SW – part of the Finlay Group (http://www.finlaygroup.com/index.php) of companies – has overseen the introduction of Terex Finlay machines at Shipton Quarry.

Gareth said: “The machinery operating at Shipton Quarry provides a sophisticated, perfectly matched-up system.

“It is all geared up to offer a number of flexible options, ensuring high value products are processed with maximum output.”

http://www.finlaygroup.com

ENDS

Notes To Editors


Finlay Plant SW is part of the Finlay Group – which comprises of eleven stand alone companies offering the most modern and diverse range of material processing equipment available in the marketplace today.

With its headquarters in Stafford, the company has a national reach across England and Wales.

The Finlay Group acts as dealers for Terex Finlay as well as other brands including Trio, Baioni and Pilot Crushtec.

Press release issued by Jane Shepherd, Shepherd PR, T: 01538 308685/308099 M: 07985 129315 E: jane@shepherd-pr.com
End
Source: » Follow
Email:***@shepherd-pr.com Email Verified
Tags:Earthline, Finlay, Quarry, Screening, Crushing
Industry:Industrial, Construction
Location:England
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
Shepherd PR PRs
Trending News
Most Viewed
Top Daily News



Like PRLog?
9K2K1K
Click to Share