Oct. 19, 2010 - PRLog -- From time to time we all like a change of decor within our homes, and who can blame us!? If this sounds a bit like something you've got planned for the near future then why not try adding a statement by installing a Designer Radiator. Designer Radiators are the perfect addition for providing that much needed character and a touch of flair to a dull or tired room.

Once you have purchased your new luxury Designer Radiator or Heated Towel Rail it is time to install. It is advisable to use the services of a professional when plumbing, however changing a radiator is pretty simple as long as you follow the guidelines. Some radiators are different so you need to ensure you have the correct instructions.


Turning off the water supply

Turn off your water supply to the existing radiator.
Turn off your central heating system and allow all pipe-work and radiators to cool down.
Turn the manual "control" (Large head with digits) valve to the "OFF" position - (at the opposite end of the radiator you will find the "lock shield" valve)
Remove the protective top cap from the "lock shield" valve and use a wrench to turn the top piece clockwise as far as possible (Don't forget to count the number of turns required, as this must be reversed once you replace the radiator).

Draining the old radiator

Place a large bowl or bucket underneath the manual "control" valve.
Grip the valve with a wrench and hold it steady whilst using another wrench to gently loosen the nut on the valve that connects to the radiator
Next you will need to vent the radiator of air to break any vacuum that may be inside and allow the water to flow from the control valve. Do this by using the air bleed cap on the top edge of the radiator.
Use a towel or old cloths/rags to catch any drips from the bleed valve.
Continue to drain all of the fluid from the radiator out of the control entry until the flow stops.


Re-hanging the radiator/Hanging your new radiator

Fit the hanging brackets to the wall according to the manufacturers specific instructions.

Now that you’re ready to hang the radiator, wrap a piece of PTFE tape (also known as thread seal) about 15cm long around the valve threads.
When fitting a new radiator or towel rail that is the same width as the previous remember to fit the valves first according to the manufacturer’s directions before fitting the product onto the wall. Then open the valves to fill the radiator from the central heating system.
Lift the radiator/towel rail onto the wall brackets and tighten the fittings - You may need help to lift the radiator.
Open the manual control or thermostatic valve fully and then open the bleed valve at the top/rear of the radiator - Water will now fill the radiator.
Once the water has stopped filling, open the lock shield valve by the same number of turns you needed to close it.
Double check all joints are water tight and tighten if necessary, now turn on your central heating system and re-check once more.

If you plan to replace your old radiator with an updated design or sized radiator/ towel rail, the pipe-work may not connect up exactly.
In this case you will need to drain your central heating system so that pipes directly under the floor can be replaced or adjusted to fit onto the new radiator.
Unless you are experienced in this type of DIY we would suggest that you call a fully qualified plumber to fit the new Designer Radiator or Heated Towel Rail for you.

For more information visit http://www.cosyroomsltd.co.uk or call them on 0845 2570827 and speak to one the customer service team for professional advice.

# # #

Lancashire Online Marketing Consultants offering advice and solutions to get your website more traffic and conversions
End
Searchability Ltd PRs
Trending News
Most Viewed
Top Daily News



Like PRLog?
9K2K1K
Click to Share