Follow on Google News News By Tag Industry News News By Location Country(s) Industry News
Follow on Google News | Nova Verta built another big plant for a big french company producer of trainsNova Verta International built a new installation for one of the two leader companies of the train manufacturer sector. A booth of remarquable sizes constructed thanks to the use of modern technology, and with the most advanced paint systems.
By: Adv. Agency Della Nesta, Press Office Along the length of the installation, 33 meters long, the French Company asked for building five separate work areas, in order to check, step by step, the railcars advancement during all the production phases, and to control the costs and manpower analysis. Along the whole length of this plant there is a central row, placed under the rails that supports the trains, where the workers can walk and stay to observe the painting procedures in every details. The lateral walls are composed by sheet panels, 60 mm thick, with glass wool in-between. There are 2 main motorized doors, and 12 back doors on the sides. At the topside of the installation there are 50 neon lightings and 50 at the bottom, divided into 2 line; 25 neon lightings are placed into the plenum in flat position. Every lighting fixtures is composed by 4 neon and allows a diffuse and homogenous light upon the entire surface. Nova Verta paid great attention to every details and in such a way the French Company can assure a perfect final result. There are many optional extras that allows the highest quality standard for a painting that is “facilitated” End
Account Email Address Disclaimer Report Abuse
|
|