Two mud tank systems for workover drilling rig are going to be delivered from GN Solids Control Factory to Indonesia. From this news 5 Solids Control System Order in 10 Days,you will see we are still building another 3 mud systems,actually,now GN still have another 5 drilling mud systems in production.
After the 2 workover drilling rig mud tank system,we are going to deliver another 2 HDD mud system in few days.
http://www.gnsolidscontrol.com/
Solids Control Equipments for each workover drilling rig mud system:
Two linear motion ZS830×108-2 Shale Shaker
One LWF450×842N decanter centrifuge
ZS830×108-2 Shale Shaker for workover mud tank system
One LWF450×842 decanter centrifuge for workover rig mud system
Being honest and working fast to offer clients customized solutions for drilling rig mud system leads GN keeps getting orders from both new and old clients.Welcome to contact GN for your workover drilling rig mud system free design.
http://www.gnsolidscontrol.com/
Korean Client from a HDD(Horizontal Directional Drilling) Company come to visit GN drilling mud equipments factory to negotiate about purchasing HDD mud cleaners,sand pumps,and re-design for his present HDD mud system.
With GN experienced Engineers in HDD mud system design,we provide a satisfied re-design proposal from clients mud tank to a fluids processing system.Clients is more than happy of our customized & cost-effective solution,and told us they will send the purchase order after they come back to Korean.
Negotiation about HDD Mud Cleaner.
GN Solids Control Provide drilling mud equipments and mud treatment system for HDD from large to small models,unlike other hdd mud system supplier,GN HDD mud system is customized enough,cost-
Photo:
http://www.prlog.org/




