ROCKVILLE, Md. - Dec. 16, 2022 - PRLog -- The data is everything. The vast amount of information that facility managers need for their jobs and the conceptual frameworks that support effective and efficient facility management are referred to here as 'data'. Facility management is using BIM to address existing industry difficulties for BIM & FM Interaction. The utilization of new technology, combining the various disciplines in a single project, and changing the way that engineering is interacted relies on the success of BIM.
The construction project focuses on the use of BIM and COBie in sports facilities and operation & maintenance data to view the benefits of BIM based on the region's experience with building.
Tejjy Inc BIM service provider in USA is all set to work together with Building Information Modeling and Facility Management.
Sukh Singh, the V.P. of Tejjy Inc mentioned – "We are all set to work with BIM for the design of HVAC installation in sports facilities. Inspired with the design of the Qatar Stadiums, hosting the FIFA World Cup 2022, Qatar, our architects and BIM engineers are coming up with competitive design solutions for their project effectively and efficiently."
Team Tejjy to focus on network modeling and user interface for sports facilities:
Network Modeling:
The simplicity and flexibility of building an unlimited piping/air-ducting network model using a single line, which is then transformed into 2D and 3D piping models.
Intelligent network modeling, which identifies the segments, nodes, and receptors of the network model logically and displays the numerical values of the network design parameters at each level of the design process.
Every pipe segment and/or the complete network are highly visible and simple to operate, giving the designer a number of ways to get involved and find the best design solutions.
Every network component (including pipes, fittings, grills, etc.) is an object with its own attributes that the user can simply change.
User Interface:
BIM makes it easier and faster for users to build piping networks. Software applications like Revit®, Archicad®, Vectorworks®, SketchUp Pro®, etc provide major file sharing convenience with the other discipline team members involved in the project. The end result is an integrated BIM environment that allows the user to work and interact with both the 3D building model and the HVAC installation model directly.
It's great that BIM can manage a variety of projects of all sizes and types, but much more crucial is the flexibility BIM provides while modeling MEP project, which is essential for the automatic creation of the final MEP shop drawings (https://www.tejjy.com/our-services/mep-services/mep-shop-...) and quantity takeoff.