Tejjy BIM Engineers USA Providing Step-by-Step Guide to Commercial Construction

BIM proves to be a constant support to commercial construction.
 
WASHINGTON - July 3, 2022 - PRLog -- The sheer volume of work involved in developing a new commercial structure frequently overwhelms inexperienced project managers. They have to take the responsibility of organizing, coordinating, and overseeing the project from beginning to end. Implementing Building Information Modeling, Tejjy BIM service providers ensure that the construction project gets completed on time, negotiating contracts and obtaining building permissions and licenses.

BIM proves to be a constant support to commercial construction through various stages of building development:

1.       Pre-Design Phase:

BIM helps a developer to plan a new commercial structure in the pre-design phase. The technique specifies the project goal with a degree of accuracy, determining final project cost. Further, combined with permit expediting services, BIM confirms that new building development complies with the required zoning code. Consequently, there is no delay in the construction. By reducing labor and material requirements and battling variable and rising building product costs, several BIM service providers (https://www.tejjy.com/our-services/bim-3d-model/) assist commercial builders in lowering building expenses.

Sukh Singh, the Vice President of Tejjy Inc. BIM Service Provider in USA mentioned:  "BIM helps us deal with emergencies. Implementing BIM engineering, we confirm that the water and sewage systems can support company needs. Our engineers assess whether piles are necessary for the building at the site and find out whether the soil is contaminated and perform environmental testing. We specialize in design-build commercial building construction services to speed up the process during the pre-design phase."

Tactics of Building Planning & Development:
  • Estimating cost of building and design items, along with required machinery
  • Establishing general dimensions and purpose of rooms
  • Ensuring a viable project, determining building's orientation to utility connections and development covenants
2.       Design-Build Phase:

At the design-build stage, a complete set of drawings with final specifications, including costs and schedules for construction, are produced with BIM model. Hence, the building could be accurately completed by contractors using final specifications and building designs derived from the BIM model.

In addition to the architect and builder, design-build phase facilitates:
  • Mechanical engineers in charge of plumbing & air-conditioning designs
  • Structural engineers in charge of structural design
  • Electrical engineers selecting project's electrical design & layout
  • Civil engineers for commercial projects to build parking lots, handle drainage, and connect to local infrastructure

3.       Pre-Construction Phase:

At the pre-construction stage, BIM enables contractors to fulfil time-consuming stuff like acquiring building permits, marketing presentations, forming a construction team, procurement, etc. Many believe BIM is all about pre-construction support.

Seek assistance from competent commercial architecture firms (https://www.tejjy.com/benefits-of-seeking-a-commercial-ar...) or architectural engineering service providers (https://www.tejjy.com/our-services/architectural-engineering-services/) for fast approval. To discuss your project, contact Tejjy BIM consultants at 202-465-4830 or info@tejjy.com.

Contact
Tejjy Inc.
info@tejjy.com
+1-202-465-4830
End
Email:***@tejjy.com
Posted By:***@tejjy.com Email Verified
Tags:BIM commercial construction
Industry:Construction
Location:D.C. - Washington - United States
Subject:Services
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse



Like PRLog?
9K2K1K
Click to Share