Re-entry project - 6 oil wells - ready to turn on

APPLETON, Minn. - Jan. 29, 2019 - PRLog -- The plan is the do all workover on the first 6 wells, get them producing and flowing oil into the tanks etc. when this is done. We will look at the potential on drilling new wells or going uphole in some of the first 6 wells, to see if we need to do small frachs on some of them to increase production or drill new shallow wells

These current wells have 3-4 more produceable zones up hole, which in this area, some came in flowing 60 bbls a day, from upper zones perforated, acidized and fraced. Good gas volume was also produced in these shallow zones.


Minimum investment is USD 5.714 this would give you 1.00 % NRI & 1.58 % working interest in the project.


R.O.I./Cashflow calculations, based on a 10 year lifespan:

BBL DAY ,R.O.I. (return on investment) , Mth. Cashflow

10 BBL DAY          3,9          $156

12 BBL DAY          4,7          $225

14 BBL DAY          5,5          $262

16 BBL DAY          6,3          $300

If you want more information about this project, do get in contact with us, we are working out on location as we speak.

http://texoilcompany.com/ritchie/

Contact
TEX OIL COMPANY /U.S.E.B. Inc.
431 East Rooney Ave.
Appleton, MN 56208
***@texoilcompany.com
End
Source:
Email:***@texoilcompany.com
Posted By:***@texoilcompany.com Email Verified
Tags:Invest In Oil Wells
Industry:Investment
Location:Appleton - Minnesota - United States
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse