Follow on Google News News By Tag Industry News News By Place Country(s) Industry News
Follow on Google News | Final inspection success for SIPOS at Atucha IIOver the last forty years, just under 1,200 SIPOS Aktorik actuators have been supplied to Atucha nuclear power plants (NPP) in Buenos Aires.
By: SIPOS Aktorik The Central Nuclear Atucha (CNA) comprises two pressurised heavy-water reactor units. The Atucha I unit (340 MW) has been in successful operation since 1974. Commercial operation of the Atucha II (692 MW / PHWR) plant is targeted for the end of 2014. SIPOS’ support for the Argentinian NPP development has included revisions, conducted in stages to meet construction requirements. Latest news regarding SIPOS’ actuator installations at the scheme is the company’s successful final inspection at Atucha II. Under commission from the end user, Nucleoelectrica Sociedad Anonima Argentina, the review was conducted in April this year. A joint group of SIPOS specialists and Atucha technicians assessed a number of the installed actuators. During the inspection period, Atucha II staff received additional training regarding adoption of SIPOS’ nuclear actuators. www.sipos.de SIPOS Aktorik GmbH, Im Erlet 2, D-90518 Altdorf, Germany Tel. +49 (0) 9187 / 9227- 0 Fax +49 (0) 9187 / 9227-5111 Email info@sipos.de End
Account Email Address Account Phone Number Disclaimer Report Abuse
|
|