Construction of PS10B Storm Water Pumping Station & Rising Main On Going project by SGCC

The Project requires the construction of a new Pumping Station (PS10B) in Industrial Area 10 - Sharjah, along with a 1.8m diameter Rising Main to the Sea.
By: Sharjah General Contracting Co.
 
AL MADAM, UAE - June 2, 2014 - PRLog -- Project Name : Fifth Industrial Square Upgrading Project/Sharjah (04th Phase) - Construction of PS10B Storm Water Pumping Station & Rising Main from Sheikh Mohammed Bin Zayed Road to the sea

Consultant : Halcrow International Partnership (HIP)

Client : Ministry of Public Works

Location of Project :Sharjah, UAE

Project Status : Ongoing The Project requires the development of another Pumping Station (Ps10b) in Industrial Area 10 - Sharjah, alongside a 1.8m diameter Rising Main to the Sea. Ps10b will release storm water from another seepage framework which has been developed to empty water out of the E311 thruway in the region of the Fifth Industrial Square in Sharjha. Along the last a piece of the climbing primary course, from Industrial Area No. 07 to the ocean, a second pipe (2.4m diamter) will be laid in parellel.

Read the full detail on the Sharjah General Contracting Website.

Source: http://www.sgcc.ae/construction-of-ps10b-storm-water-pumping-station-and-rising-main-drainage-pipe-line

Contact
Sharjah General Contracting Co.
***@sgcc.ae
+971 6 534 7171
End
Source:Sharjah General Contracting Co.
Email:***@sgcc.ae
Tags:Drainage Pipe Line, Construction, Pumping Station, Pumpstation
Industry:Construction, Services
Location:Al Madam - Sharjah - United Arab Emirates
Subject:Projects
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
Heavy Equipment News
Trending
Most Viewed
Daily News



Like PRLog?
9K2K1K
Click to Share