Construction of PS10B Storm Water Pumping Station & Rising Main On Going project by SGCC

The Project requires the construction of a new Pumping Station (PS10B) in Industrial Area 10 - Sharjah, along with a 1.8m diameter Rising Main to the Sea.
 
INDUSTRIAL AREA 15, UAE - June 2, 2014 - PRLog -- Project Name : Fifth Industrial Square Upgrading Project/Sharjah (04th Phase) - Construction of PS10B Storm Water Pumping Station & Rising Main from Sheikh Mohammed Bin Zayed Road to the sea

Consultant : Halcrow International Partnership (HIP)

Client : Ministry of Public Works

Location of Project :Sharjah, UAE

Project Status : Ongoing The Project requires the development of another Pumping Station (Ps10b) in Industrial Area 10 - Sharjah, alongside a 1.8m diameter Rising Main to the Sea. Ps10b will release storm water from another seepage framework which has been developed to empty water out of the E311 thruway in the region of the Fifth Industrial Square in Sharjha. Along the last a piece of the climbing primary course, from Industrial Area No. 07 to the ocean, a second pipe (2.4m diamter) will be laid in parellel.

Read the full detail on the Sharjah General Contracting Website.

Source: http://www.sgcc.ae/construction-of-ps10b-storm-water-pump...

Contact
Sharjah General Contracting Co.
+971 6 534 7171
***@sgcc.ae
End
Source:Sharjah General Contracting Co.
Email:***@sgcc.ae
Tags:Construction, Pumping Station
Industry:Construction, Services
Location:Industrial Area 15 - Sharjah - United Arab Emirates
Subject:Projects
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
Heavy Equipment PRs
Trending News
Top Daily News
Top Weekly News



Like PRLog?
9K2K1K
Click to Share