Located at 7171 N. Dale Mabry Highway, the 17,579 square-foot project includes interior demolition and reconstruction of a new orthopedic unit on the hospital’s top floor. Upon completion in spring of 2013, the department will consist of 25 private patient rooms, nurse stations and rehabilitation areas.
The Stevens Construction team includes Dan Adams as project manager; Al Stonys as superintendent;
With offices in Fort Myers, Orlando and Tampa Fla., Stevens Construction specializes in providing construction management, general contracting and consulting services to clients and design professionals. Other services include site and design team selection, budgeting, project scheduling, permitting, cost and quality control and warranty service. The company builds healthcare, commercial and hospitality facilities. For information, visit www.stevensconstructioninc.com or call 239-936-9006.
About Florida Hospital Carrollwood
Florida Hospital Carrollwood is part of the Florida Hospital Tampa Bay Division, a member of the Florida Hospital organization of Adventist Health System. Florida Hospital Carrollwood is a 120-bed community hospital specializing in General Medicine, General Surgery, Orthopedic Surgery, Knees and Joints, Spine Surgery, Wound Care, ENT, Bariatric Weight Loss Surgery, as well as other services that meet our mission of healing the mind, body and spirit. It’s Knee and Bariatric Weight Loss Surgeons are known for their revision work, correcting procedures done elsewhere. Spine Surgeons at Florida Hospital Carrollwood perform specialized procedures not available elsewhere in the world. In addition, Florida Hospital Carrollwood is the only hospital in the nine-county Tampa Bay area to utilize the Mazor Renaissance™



