Follow on Google News News By Tag Industry News News By Place Country(s) Industry News
Follow on Google News | FlexiDry speeds up the screeding for Stanley Park School, SuttonWhen a series of unexpected delays prolonged the Stanley Park school project, FlexiDry fast drying floor screeds helped CSC Screeding Ltd expedite the screeding and get part of the screed ready for the final floor finish in just 7 days of screeding.
When traditional floor screeds take up to 110 days for drying, FlexiDry offered screeding contractors, CSC Screeding Ltd a quick drying alternative which got the screed ready for the finial floor finish within just 7 days of installation, and allowed light foot traffic to proceed as early as 12 hours after screeding. Two formulations of FlexiDry- FlexiDryF1 and FlexiDry F3 were used for the project. FlexiDry F1 which yields a drying time of 7 days was used for 1000 sq.m of the flooring, and FlexiDry F3 with a drying time of 21 days was used for the remaining 2000 sq.m area. As the different formulations of the screed could be made by merely altering the concentration of the liquid screed additive, FlexiDry helped the contractors accommodate unexpected plan changes without causing huge amounts of wastage. Apart from expediting the entire screeding process, FlexiDry also provided high sustainability standards, as required by the BREEAM (Building Research Establishment environmental Assessment Method) accredited Stanley Park school building. According to contractors CSC, 100% recyclability, minimal dust pollution and elimination of polythene curing were other features of the screed that made it a perfect fit for the project. End
Account Email Address Account Phone Number Disclaimer Report Abuse
|
|