1. Latest News
  2. Submit Press Release
  1. PR Home
  2. Latest News
  3. Feeds
  4. Alerts
  5. Submit Free Press Release
  6. Reporter Account

800 Homes Protected From Sewage Floods

An £80million scheme to stop more than 800 West Ham homes flooding with sewage has been completed.

FOR IMMEDIATE RELEASE

PRLog (Press Release) - Apr 13, 2010 -
An £80million scheme to stop more than 800 West Ham homes flooding with sewage has been completed.

The three-year project, one of the largest sewer flooding schemes Thames Water has ever carried out, includes:

•   a new two-mile sewer, 2.8 metres wide - one of the largest sewers built in   London – to carry away excess rainwater and sewage during storms, preventing flows backing up into streets and properties;
•   a new sewage pumping station at Abbey Mills;
•   3.5 miles of new and larger sewers linking to the main sewer tunnel.

The two-mile sewer was dug by tunnel boring machine Theodora, known locally as “Dora the Bora”, who spent seven months munching through 70,000 tonnes of  earth 20 metres below the Jubilee Line, Forest Gate, Woodgrange Road, West Ham Park, Vicarage Lane, Abbey Road and over the channel tunnel rail link.

Lawrence Gosden, Head of Capital Delivery for Thames Water, said:

“Protecting customers from the misery of sewer flooding is a top priority for us. No-one should have to put up with this truly horrible experience.

“Hundreds of homes in West Ham have been badly affected in the past and I am extremely pleased that a long-term solution is now in place to protect them.

“I would like to thank the local community for their cooperation and patience during the works. And I’d like to thank Theodora for her hard work too.”

John Couch, Interim Deputy Divisional Director, Highways, Transport and Parking for Newham Council, said:

“This scheme is very important for the borough as it will provide long-term protection from flooding during times of heavy rainfall for several hundred businesses and homes in West Ham.”

The tunnelling machine was named Theodora by local schoolgirl Eileen Edusah, after her mother.

The scheme was delivered by Costain and designed by Aecom.

--- end ---

Click to Share

Contact Email:
***@thameswater.co.uk Email Verified
Source:Thames Water Utilities Ltd
City/Town:reading
State/Province:Berkshire
Country:United Kingdom
Industry:Engineering, Construction, Environment
Tags:sewer flooding, , , costain, ,
Last Updated:Apr 13, 2010
Shortcut:http://prlog.org/10624153
Disclaimer:   Issuers of the press releases are solely responsible for the content of their press releases. PRLog can't be held liable for the content posted by others.   Report Abuse

Upcoming Press Releases...



  1. SiteMap
  2. Privacy Policy
  3. Terms of Service
  4. Copyright Notice
  5. About
  6. Advertise
Like PRLog?
3.5K1.4K1.3K
Click to Share