1. Latest News
  2. Submit Press Release
  1. PR Home
  2. Latest News
  3. Feeds
  4. Alerts
  5. Submit Free Press Release
  6. Reporter Account

CB Marine Design LLC Chosen for Emory S. Land Design Support

Cascade General Shipyard has awarded CB Marine Design LLC a multi-part contract for $115,000 to provide engineering and drawing support for the USS Emory S. Land (AS-39).

FOR IMMEDIATE RELEASE

 
CB Marine Design Logo
CB Marine Design Logo
PRLog (Press Release) - Jan 20, 2010 -
BREMERTON, Washington (January 2010) - Cascade General Shipyard has awarded CB Marine Design LLC a multi-part contract for $115,000 to provide engineering and drawing support for the USS Emory S. Land (AS-39).


This is a four part contract.  The first portion is to update the Topside Antenna Arrangement Selected Record Drawing to reflect the current Antenna Arrangement for the vessel.  A number of the original Antennae have been removed and a number of new Antennae are present.  CB Marine Design LLC will survey the vessel with ship’s crew to determine the extent of the changes and update the drawing accordingly.


The second task is to update the Lighting and Receptacle One Line Diagram.  The ship’s lighting and receptacle electrical systems have gone through a major overhaul to accommodate the many berthing and space changes incorporated as part of the recent Habitability Modifications.  CB Marine Design will survey the vessel and update the one line diagram to reflect the actual conditions found aboard the vessel.


The third task is to create an all encompassing Power System One Line Diagram and update it.  Currently, there is not a full power system one line in AutoCAD format.  CB Marine Design LLC will take approximately 40 reference drawings to create a fully encompassing Power System One Line Diagram.  CB Marine Design will survey the vessel and update the one line diagram to reflect the actual conditions found aboard the vessel.


The last task is to create the design for a new Grease Storage Locker.  Currently, there is an unused space on the 02 Level aft.  It was a trash burner room, but MSC would like to convert it into a Grease Locker and a Deck Workshop.  CB Marine Design LLC will survey the vessel and create a 3-D model of the space.  This model will be used to create the deliverable drawings, including Arrangement, Ventilation, Electrical, CO2, and Structural drawings.


CB Marine Design LLC is a small business dedicated to delivering engineering and design support to commercial repair shipyards.  Our expertise in shipyard management, engineering, and detail design 2D and 3D drawings provides allows us to provide the required deliverables in a manner that helps shipyards implement the changes using less resources.  To find out more, please visit www.weloveyourship.com


Contact:

Joe Wrinn, Owner

joe@cbmarinedesign.com

302-387-0133

WeLoveYourShip.com

Photo:
http://www.prlog.org/10496785/1

# # #

About CB Marine Design: Our goal is to provide U.S. commercial repair shipyards with top quality engineering, design, and consulting services. We have already received a good amount of praise for our delivered drawings and engineering reports. We have multiple contracts out right now aboard the USS Emory S. Land working as a subcontractor for Vigor Marine.

--- end ---

Click to Share

Contact Email:
***@cbmarinedesign.com Email Verified
Source:CB Marine Design
City/Town:Wilmington
State/Province:Delaware
Country:United States
Tags:, , shipyard management, , ship engineering
Last Updated:Jan 20, 2010
Shortcut:http://prlog.org/10496785
Disclaimer:   Issuers of the press releases are solely responsible for the content of their press releases. PRLog can't be held liable for the content posted by others.   Report Abuse

Upcoming Press Releases...



  1. SiteMap
  2. Privacy Policy
  3. Terms of Service
  4. Copyright Notice
  5. About
  6. Advertise
Like PRLog?
3.5K1.4K1.3K
Click to Share