The “Executive Range” has been specifically designed for the requirements of small to medium sized office buildings. New modular buildings can be extremely costly but the “Executive Range” has been designed to be as cost effective as possible. Many new modular buildings have a stacking facility to create 2 or 3 story buildings but this is a costly exercise and one that a customer requiring only a single story building does not want to pay for.
By eliminating these unnecessary pieces of engineering, the “Executive Range” leads the way in affordable small to medium sized modular building solutions without compromising on the aesthetics of the building. The buildings have a galvanised steel frame, plastic coated steel exterior and large double glazed aluminium framed powder coated triple windows in the colour of the client’s choice. The interior comes complete with hot and cold air conditioning.
The high specifications within the “Executive range” come complete with full compliance in accordance with the current Health & Safety and CDM regulations and manufactured to the latest 2006 Part L2A building and disability regulations.
The first order for an “Executive Range” building has already been placed, delivered and completed at Hutchesons' Grammer School in Glasgow. The order was for a new manufactured 6 bay modular admin office building which was fully completed within 2 days of delivery with total satisfaction of the client.
Portable Building Sales Ltd (http://www.portablebuildingsales.co.uk) is a small but proud and professional company with small overheads and an enviable reputation. Based in East Yorkshire but supplying modular buildings and portable buildings throughout the whole of the UK, their overheads are kept to a minimum and no unnecessary costs are passed onto the client.
For more information visit http://www.portablebuildingsales.co.uk/



