+ Bookmark This Page    
Preferences  |  4:55 PM
  1. Home
  2. Latest News
  3. Submit Press Releases
  4. Search Jobs
  5. Search Businesses
  1. News Home
  2. News Archive
  3. By Category
  4. By Location
  5. By Date
  6. By Tag
  7. Newsletter
  8. 40,000 RSS Feeds
  9. Submit Free Press Release
   
Filter News
Category

Country

State / Province
Select Country First

City / Town
Select State First

The Mack Group, LLC Logo

The Mack Group, LLC Completes Industrial Asbestos Removal Project

The MACK Group, LLC recently completed the second and last phase of asbestos abatement removal at a large former battery manufacturing plant in Northern New Jersey.
 

FOR IMMEDIATE RELEASE

PRLog (Press Release)Nov 20, 2008 – The MACK Group, LLC recently completed the second and last phase of asbestos abatement removal at a large former battery manufacturing plant in Northern New Jersey.  

The MACK Group, LLC (MACK) was selected to perform the project based on their expert level of asbestos contractor services, their professional reputation, their attention to safety and schedule as well as their economical approach to asbestos removal services.

This last phase of the asbestos removal project consisted of the asbestos abatement of numerous types of asbestos containing materials (ACM). ACM consisted of 30,000 sf of VAT, 9,000 lf of pipe insulation, 500 sf of transite panels, and various amounts of boiler insulation and gaskets, mastic, plaster, tar coatings.  These asbestos materials were located throughout the facility and required close coordination to make sure all materials were properly remediated.

Prior to asbestos abatement activities, a 10 day notification was submitted which is a written notification of intention to demolish in accordance with 40 CFR 61.145 to 61.155 and N.J.A.C. 7:26-2.12(d) and (e).

Proper asbestos wetting, removal and handling techniques were employed to safely remove the materials.

MACK used various techniques to remove the asbestos plaster materials. Wetting of all friable ACM and bagging the ACM using poly-wrapping was one method.  Also utilized was the wetting and direct placement in lined (at least 6 mil thick liner) and sealed bulk containers.
To remove the asbestos floor tiles and mastic, MACK used a combination of proprietary flooring removal machines that they own in their fleet of abatement equipment.   The flooring removal machines have zero emissions and fumes allowing for use in restricted ventilation areas.  These machines allowed MACK to easily remove the floor tile and mastic down to the original concrete floor surface without damaging the existing concrete.  There was also tile under wooden flooring which was also easily removed using these specialized machines and expertly trained personnel.

Transite panels were removed utilizing laborers on manlifts and a Lull.  The laborers carefully removed the bolts from the panels and utilizing the Lull were able to lower the panels to the ground on polyethylene sheeting.  The transite panels were then wrapped and stacked for offsite disposal.  

The transportation of asbestos and ACM was in accordance with N.J.A.C. 7:26-3.5(d) and by registered New Jersey solid waste vehicles.  ACM was then properly disposed at a licensed landfill.

The project was a complete success as it was accomplished on schedule, without injury or incident and within the client’s budget.

About The Mack Group, LLC

The MACK Group, LLC operates throughout the United States and Puerto Rico providing various contracting and consulting services.  These services include asbestos abatement, asbestos consulting, asbestos removal, concrete surface preparation and floor covering removal services.  The company also offers mold remediation, shot blasting, Blastrac and Terminator Floor preparation services and fluorescent bulb and ballast recycling services.


Contact Information

The MACK Group, LLC
1500 Kings Hwy. N., Ste 209
Cherry Hill, NJ 08034
Tel:   973-759-5000
Fax:  973-759-5554
Web:   www.MACKgrp.com

For more information contact:
Steve King (973) 759-5000 ext. 302
Email: sking@mackgrp.com

# # #

The MACK Group, LLC operates nationwide providing asbestos abatement, asbestos consulting, asbestos removal, concrete surface preparation and floor covering removal services, mold remediation, shot blasting and interior demolition contractors services.

# # # + Share This Article Click to see PDF Version of this Press Release

Email to a Friend     Visit Press Room       Previous News   Next News


Issued By:Steve King
Contact Email:Click to email
Phone:973-759-5000
Fax:973-759- 5554
Address:1500 Kings Highway N.
:Suite 209
Zip:08034
Country:United States
Categories:Business, Environment, Contractor
Tags:asbestos, asbestos removal, asbestos contractors, floor tile removal, licensed asbestos removal contractors, asbestos
Last Updated:Nov 20, 2008
Shortcut:www.prlog.org/10144328

Disclaimer:   Issuers of the press releases are solely responsible for the content of their press releases. PRLog.Org can't be held liable for the contents of the press releases.   Report Abuse


Most Viewed

How To Build Your Own Solar Power Panels To Save On Electricity - 2515 views

Home Wind Turbine - How To Make Wind Turbine - 1114 views

How To Make Do It Yourself Solar Power System To Save On Electricity - 1107 views

BITS Pilani Alumni Take up the case of Andhra Board Topper for Financial Support - 822 views

The 2009 Teen Choice Awards Pre-Party set for August 5th at Level 3 in Hollywood - 813 views


Related

The MACK Group Announces 2008 to be a Year of Non-Recordable Incidents and Continued EMR below 1

The MACK Group, LLC Completes Removal of Cork and Rubberized Flooring

The MACK Group, LLC Completes Asbestos Contaminated Boiler Room Cleanup

The MACK Group, LLC Completed Asbestos Tile and Mastic Abatement Project

The MACK Group, LLC Completes Floor Mastic and Glue Removal Project at Mall in NJ


Most Viewed Weekly

How To Build Your Own Solar Power Panels To Save On Electricity - 2515 views

Home Wind Turbine - How To Make Wind Turbine - 1114 views

How To Make Do It Yourself Solar Power System To Save On Electricity - 1107 views

BITS Pilani Alumni Take up the case of Andhra Board Topper for Financial Support - 822 views

The 2009 Teen Choice Awards Pre-Party set for August 5th at Level 3 in Hollywood - 813 views


Most Viewed Daily

Plasmon UDO migration to Blu Ray for RVI, iseries, FileNet Document Management Users!

Jack M. Shapiro: Market Research for Branding New Medical Products and Services

Brandywine Valley Wine Trail "Big Bang" BBQ Weekend

Spinal Cord Injury Patient Pins Hopes On Stem Cell Therapy

Costa Rica's Newest Coffe Company

Previous News

Next News

Nov 20, 2008 News

Nov 2008 News

Are you a Journalist?


For Businesses ...


Tutorial on Free Marketing


July 2009
Su Sa Fr Th We Tu Mo
5 4 3 2 1
June 2009
30 29
28 27 26 25 24 23 22
21 20 19 18 17 16 15
14 13 12 11 10 9 8



  1. SiteMap
  2. Contact PRLog
  3. Privacy Policy
  4. Terms of Use
  5. Copyright Notice